container gantry crane project

Project Background

In the logistics and transportation sector, the efficiency of container handling is crucial, especially in railway transfer freight yards. Sinoko’s 40.5-ton container gantry crane is specifically designed for the loading, unloading, and stacking of containers in railway transfer freight yards and large container storage areas. This advanced crane enhances operational efficiency and safety, making it an ideal solution for modern logistics.

Features of Sinoko 40.5-ton Container Gantry Crane

  • U-Shaped Gantry Structure: The dual cantilever "U" shaped gantry design allows for a larger operational area, facilitating more effective container handling.

  • Rotating Trolley Lifting Mechanism: This feature enables the crane to meet the stacking requirements of containers in different orientations, improving flexibility in operations.

  • Electric Telescopic Container Lifting Device: Capable of accommodating various container sizes, this device ensures efficient lifting and handling of diverse container dimensions.

  • Anti-Sway Lifting System: This system minimizes swaying during lifting, enhancing stability and safety during operations.

  • Automatic Alignment Function: The crane is equipped with an automatic alignment feature that corrects its path during operation, ensuring precise handling.

  • Energy Recovery Technology: This technology allows the crane to recover energy during operation, contributing to lower energy consumption and increased efficiency.

  • Crane Safety Monitoring and Management System: The integrated safety system ensures that operations are secure, reliable, and intelligent, providing real-time monitoring and management of the crane's performance.

Project Implementation

The deployment of the Sinoko 40.5-ton container gantry crane in a railway transfer freight yard involved several key stages:

  1. Needs Assessment: Collaborating with stakeholders to understand specific operational requirements and site conditions, ensuring the crane's design aligns with practical needs.

  2. Design and Customization: Tailoring the crane's specifications to meet the unique demands of container handling in the railway environment.

  3. Installation and Commissioning: A dedicated team oversaw the installation and commissioning of the crane, ensuring minimal disruption to existing operations.

  4. Training and Support: Comprehensive training was provided to operators, along with ongoing technical support to ensure optimal crane utilization.

Project Outcomes

The introduction of the Sinoko container gantry crane yielded significant improvements in the railway transfer freight yard:

  • Enhanced Efficiency: The crane's advanced features allowed for faster loading and unloading of containers, significantly increasing operational throughput.

  • Improved Safety: The integrated safety monitoring system ensured that all operations were conducted securely, reducing the risk of accidents.

  • Cost Savings: The energy recovery technology reduced operational costs, contributing to a more sustainable and economically viable operation.


Sinoko's 40.5-ton container gantry crane stands out as a leading solution for container handling in railway transfer freight yards. With its innovative design and advanced safety features, it not only enhances operational efficiency but also ensures safe and reliable operations. Sinoko remains committed to providing cutting-edge lifting solutions that meet the evolving needs of the logistics industry.

Enhance your container handling operations today—contact us for a consultation!