Industrial Double Girder Gantry Crane China Introduction:
1. It is a medium and heavy size crane which travels in track.
2. Structure: main beam, support legs, crane traveling organ, trolley, electric equipment, strong lifting winch
3. Power is supplied by cable or slide wire.
4. It is prohibited for lifting melt metal, flammable, explosive, corrosion, overloading, dust and other dangerous operations.
The industrial gantry crane is designed to be easy to operate and maintain. It is typically equipped with safety features such as limit switches, overload protection, and emergency stop buttons.
Double Girder Gantry Crane China Environmental Conditions:
1.The temperature in the working environment should be in the scope of -20DC to 45 DC and the relative humidity is not higher than 95%(with dew).
2.During work, the wind speed should be no higher than 20m/s; and during non-work, the wind speed should be no higher than 44m/s.
3.The crane travelling lane is supposed not to slope more than 1% and no more than 3% for local slope. The ground slope on the two sides of the span should be in the same direction, that is to say, both up slope or down slope at the same time.
Lifting Capacity | T | 16/3.2 | 20/5.0 | 32/8.0 | 50/10.0 | 75/20.0 | ||
Span | M | 18-35 | ||||||
Max. Lifting Height | Main hook | M | 10/12 | |||||
Aux hook | 10.6-12.6 | 10.6-12.6 | 10.7-12.7 | 11.1-13.1 | 11.1-13.1 | |||
Working System | A5 | |||||||
Speed | Hoisting | Main | m/min | 15.3 | 15 | 13.2 | 5.9 | 6.25 |
Aux | 22 | 19 | 17 | 13.2 | 9.28 | |||
Trolley Travelling | 44.7 | 44.7 | 38.6 | 36 | 38.9 | |||
Crane Travelling | 30-35 | 34.5-32.9 | 52.53 | 45-38.6 | 38.5-32.6 | |||
Weight | Trolley | t | 7.1 | 8.1 | 11.7 | 16.8 | 29.4 | |
Total Weight | 92-142 | 105-148 | 92-142 | 111-156 | 189-245 | |||
Max. Wheel Load | 275-369 | 341-435 | 275-369 | 392-483 | 314-361 |
Kindly please provide the following information when sending enquiry to us.
1. Lifting capacity ______ton
2. Span _______meters (it is center to center distance between railways)
3. Lifting height ______meters (it is the distance from center of hook to floor)
4. Travelling length _____meters
5. Is the cantilever needed for the gantry crane? If yes, how long is it? Is it needed for one or two sides?
6. Industrial voltage _____V, _____HZ, 3Phases
7. Control mode
A.pendant control B. remote control C. cabin control
8. Do you also need us to supply rail and bus bar?
A. Yes B. No
9. What is the main lifting material?