Grab Bridge Crane for Scrap Charging

Scrap Charging Grab Bridge Crane with Grab is equipped with grab bucket and hoisting machinery, widely used in port, dock, station yard, mine loading various aspects such as bulk, logs, minerals, coal, ballast, conditions, etc.

Grab crane is a kind of automatic picking up machinery, its fetching and material movement is discharged by the driver's operation, do not need to support staff, and thus to avoid the heavy labor of workers, save the auxiliary work time, greatly improving the efficiency of loading and unloading. Grab crane can be divided into bridge type grab crane, gantry grab crane.

1. Clamshell grab crane

Applicable to the port, dock, station yard, mine loading various aspects such as bulk, minerals, coal, ballast, conditions, etc.,

2. The orange peel type grab crane

Suitable for steel scrap grab and refined work, a large amount of waste, waste landfill and construction sites torpedo, loading and unloading and handling work, automotive recycling field, the collapse of torpedo and recycling, bucket tooth can be replaced, and high hardness, wear resistant steel, to ensure that the service life is long; Valve shell can choose according to different work environment; There are whole closed type valve shell, semi-closure type valve shell, valve shell and narrow width side lobe shell.


 

Liting Capacity 

t

5

10

16

20

Max.Lifting Height  

m

20

18

22

26

Span 

m

10.5-31.5

Working System

 

A5-A7

Speed 

Trolley

 Hoisting

m/min

40.1

40.7

41.8

48.6

Travelling

44.6

45.7

43.2

43.2

Bridge travelling

93.7-114.4

112.5-101

98-87.3

87.3

Weight

Trolley

 

5.2/5.9

8.2/9.1

14.8/15.9

19.3/20.4

Total

Indoor

19.9-41.3

26.5-50.4

47.3-67.9

56.1-75.6

Outdoor

20.7-42.1

27.4-51.2

48.5-69

57.3-76.8

Grab

Volume  

m 3

2.5-0.75

5-1.5

8-2.5

10--3

Dead weight  

kg

2632-2546

4800-4793

7841-8305

9812-10123

Rail recommended

43kg/m,   QU70

Power Source

3Phase  AC    380V   50HZ (As your demand)



    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    FEW TIPS

    1.Load capacity: ton?

    2.Span of the crane: m?

    3.Max. lifting height of the crane: m?

    4.What materials will be handled: ?

    5.How many hours will the crane work per day: ?

    6.Traveling distance of the crane: m?