Scrap Charging Grab Bridge Crane with Grab is equipped with grab bucket and hoisting machinery, widely used in port, dock, station yard, mine loading various aspects such as bulk, logs, minerals, coal, ballast, conditions, etc.
Grab crane is a kind of automatic picking up machinery, its fetching and material movement is discharged by the driver's operation, do not need to support staff, and thus to avoid the heavy labor of workers, save the auxiliary work time, greatly improving the efficiency of loading and unloading. Grab crane can be divided into bridge type grab crane, gantry grab crane.
1. Clamshell grab crane
Applicable to the port, dock, station yard, mine loading various aspects such as bulk, minerals, coal, ballast, conditions, etc.,
2. The orange peel type grab crane
Suitable for steel scrap grab and refined work, a large amount of waste, waste landfill and construction sites torpedo, loading and unloading and handling work, automotive recycling field, the collapse of torpedo and recycling, bucket tooth can be replaced, and high hardness, wear resistant steel, to ensure that the service life is long; Valve shell can choose according to different work environment; There are whole closed type valve shell, semi-closure type valve shell, valve shell and narrow width side lobe shell.
Liting Capacity | t | 5 | 10 | 16 | 20 | ||
Max.Lifting Height | m | 20 | 18 | 22 | 26 | ||
Span | m | 10.5-31.5 | |||||
Working System |
| A5-A7 | |||||
Speed | Trolley | Hoisting | m/min | 40.1 | 40.7 | 41.8 | 48.6 |
Travelling | 44.6 | 45.7 | 43.2 | 43.2 | |||
Bridge travelling | 93.7-114.4 | 112.5-101 | 98-87.3 | 87.3 | |||
Weight | Trolley |
| 5.2/5.9 | 8.2/9.1 | 14.8/15.9 | 19.3/20.4 | |
Total | Indoor | 19.9-41.3 | 26.5-50.4 | 47.3-67.9 | 56.1-75.6 | ||
Outdoor | 20.7-42.1 | 27.4-51.2 | 48.5-69 | 57.3-76.8 | |||
Grab | Volume | m 3 | 2.5-0.75 | 5-1.5 | 8-2.5 | 10--3 | |
Dead weight | kg | 2632-2546 | 4800-4793 | 7841-8305 | 9812-10123 | ||
Rail recommended | 43kg/m, QU70 | ||||||
Power Source | 3Phase AC 380V 50HZ (As your demand) |