Workshop Crane

Workshop crane is a sort of efficient and safe lifting equipment designed for parts storage, loading and unloading materials and workstation management. Workshop cranes play a crucial role in a modern pulp and paper plant.


Workshop crane type: workshop jib cranes, portable gantry cranes, workshop overhead crane,freestanding bridge cranes,Depending on your facility,these options are ideal for many workshop environments.


Workshop jib cranes is a new generation of light hoisting equipment made for modern production, which is suitable for high-reliability electric chain hoistsSinoko jib cranes are suitable for almost any kind of workstation.


Portable gantry cranes is manufactured for lifting equipment, loading and unloading of the warehouse, maintaining heavy-duty equipment and transporting materials, applicable for small and medium factory.The best advantage of the crane is Omni-directional movability, fast to assembly, small volume, can be moved to another are only with a minibar.


Workshop overhead crane is an bridge crane designed and manufactured to satisfy common industrial load handling requirements safely and reliably.


Freestanding bridge crane can be flexible manual, semi-automatic or automatic operation according to the working conditions. Sinokocrane make it free standing crane modular design, the standard profiles are bolted together, easy to installation & transportation.

Light Self-Weight

FEM standard material handling overhead crane with light-weight construction bridge, highly and strong resistant fatigue ability, high precision assembly, easy transportation and installation. The whole crane height, weight, wheel pressure are all about 20% lower than traditional cranes, crane traveling limit size reduction, increased its operating area, effectively saving floor space and investment cost.


Modular design

FEM standard material handling overhead crane adopts modular design of the components to form a broad product portfolio. Use detachable connection between modules for easy installation and transportation. Standard modular production to ensure the stability of product quality, shorten lead times.


Advanced manufacturing technology

Steel shot blasting pretreatment, surface quality reach level Sa2.5. Web entire cutting by CNC cutting, to ensure supply curve smooth and accuracy. Seam using submerged arc welding, ultrasound and X-ray nondestructive testing.

To buy a workshop crane perfectly met your workshops requirements, you must have a clear mind in what kinds of specific workshop crane specifications you need for your industry. The main specification of workshop crane is as follows for your reference.

Workshop overhead crane specification:

Capacity(t)
Span(m)
Lifting Height(m)
Working Class

Lifting Speed

(m/min)

Cross Traveling

Speed(m/min)

1

7.5-22.5
6/9/12
FEM2M
5/0.8
2-20(VFD)
2
7.5-22.56/9/12FEM2M5/0.82-20(VFD)
3.2
7.5-22.56/9/12FEM2M5/0.82-20(VFD)
5
7.5-22.56/9/12FEM2M5/0.82-20(VFD)
10
7.5-22.56/9/12FEM2M5/0.82-20(VFD)
12.5
7.5-22.56/9/12FEM2M5/0.82-20(VFD)

Workshop jib crane specification:


Load capacity0.5 to 10 tons
Arm Length3 m 12 m
Rotation angle360°
Work dutyA3

Portable gantry cranesspecification:

Load capacity0.25 to 10 tons
Span2 m 12 m
Lifting speed2.1 to 11.5 m/min
Hoist running speed27 to 40 m/min
Crane running speed42 to 75 m/min
Work dutyA4, A5, A6, A7

Freestanding bridge crane specification

Lifting Capacity50 kg to 2000 kg
Lifting Height1 m to 10 m
Span1 m to 9 m
Crane Control OptionsPush Button Pendants
Hoist Powerelectric, manual
Hoist Running Powermanual


Our workshop cranes are flexible, multifunctional tools designed specifically for a factory environment.  Working closely with machine builders, pulp-and-paper experts and engineering companies, we provide you with high-quality cranes and lifting systems built to perform and last.



    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    FEW TIPS

    1.Load capacity: ton?

    2.Span of the crane: m?

    3.Max. lifting height of the crane: m?

    4.What materials will be handled: ?

    5.How many hours will the crane work per day: ?

    6.Traveling distance of the crane: m?