10 ton Gantry Crane

The main beam of European Standard 10 ton Gantry Crane is a box-type structure, which is optimized by the three-dimensional space of the computer. It is more reasonable and more economical. European Standard 10 ton Gantry Crane is suitable for loading, unloading and transporting along open-air warehouses and along railway lines. Hangers include hooks, grabs, and electromagnetic chucks which can satisfy the using requirements of different occasions. The operating mode can choose the driver's cab operation and remote control operation.

1. Single main beam, welded box shape, degree of crown in accordance with national standards
2. Outriggers with rectangular steel pipe, high strength, small size
3. Steel plate material is Fe37 or Fe52 (similar to domestic steel Q235B or Q345B)
4. The web is cut by 40m CNC to ensure the smooth forming and accuracy of the crown curve
5. Main arc welding with submerged arc welding and nondestructive testing
6. After welding, the entire beam is shot blasted to Sa2.5 level, eliminating welding stress
7. Epoxy zinc-rich paint, two sides and two sides, 140μ thick, long life, beautiful appearance, good gloss
8. The main beam and the end beam are connected by high-strength bolts of grade 10.9 to ensure the structural strength and accuracy of the whole machine
9. Three-in-one vertical drive mechanism for gantry cranes, safer and more space-saving
10. The cart drives IP55, Class F insulation
11. The ground end beam adopts the flat wheel, the cow leg end beam adopts the dual rim wheel and guide wheel


10 ton Gantry Crane Schematic Diagram

Capacity10000kg
Span10.5m
Lifting Height14.5m
Lifting Speed
0-5m/min
CT Sped
2-20m/min
LT Speed
3-30m/min
Crane class
A5
Max. wheel load
69KN


If you have special requirements on the crane, please contact us and we will give you a customized solution.



    Get In Touch

    Our teams are on hand to provide you with the right lifting solutions.

    FEW TIPS

    1.Load capacity: ton?

    2.Span of the crane: m?

    3.Max. lifting height of the crane: m?

    4.What materials will be handled: ?

    5.How many hours will the crane work per day: ?

    6.Traveling distance of the crane: m?